Directional Drilling
- Boring / HDD (horizontal directional drilling) up to 10,000 feet in length and up to 42 inches in diameter.
- Boring for all utilities including oil, gas, water, sewer, electrical and communications.
In-House Guidance
- ParaTrack2 Wireline System - For drills that cannot be located using conventional walkover locating systems, up to depths of 328 feet.
- ParaTrack Gyro Module - A gyro steering tool that works in conjunction with our ParaTrack2 steering tool for drills where surface tracking is not possible, such as under rivers, lakes, or congested urban areas.
- Pressure Tool - A pressure module for recording annular pressure and downhole drilling mud pressure while drilling.
Pipeline Locating - NEW
- Use of the ParaTrack2 steering tool to locate pipelines that are too deep to pothole, or that cannot be found using traditional locating methods.
Project Management
- Oversee crews, including subcontrators, on projects
- Engineer bores and HDDs (horizontal directional drilling)
- Consult on projects